Wednesday, April 10, 2013
Informatica(9.5.1) Preinstallation Check list
Hi All;
*For Informacitca 9.5.1. Hot fix 2 preistallation check list please click here
This is my Informatica 9.5.1 preinstallation check list for IBM AIX.
- Download Informatica software 9.5.1 HF1 for AIX from my.informatica.com via Global Customer Support.
- Get the correct licence files from Global Customer support
- Install Java version 6.
- Install JDK 1.6.0 build pap6460sr9fp2-20110627_03(SR9 FP2) exactly.
http://pic.dhe.ibm.com/infocenter/sb2bi/v5r2/index.jsp?topic=%2Fcom.ibm.help.sys_rqmts.doc%2FSysRqmts_DwnldAIXJDK.html - There are some problems with AIX TAR, Install GNUTAR.
http://www.gnu.org/software/tar/ - Create User for informatica. (ex: infa, infauser, etluser... etc.)
- Set u limit to 16.000 (or unlimited.)
set ulimit -n to 16000 - Create a database user for each Power Designer domain. (ex: INFADOM)
- Create a database user for each Power Designer repository. (ex: INFAREP)
- Verify that the database users have CONNECT, RESOURCE, and CREATE VIEW privileges.
- For Oracle repositories Set the open_cursors parameter to 1000 or higher
- If exist, open the following port range: 6000 to 6113 on firewall.
- Do not believe curse of 13.
- Reserve at least 1GB for Domain and repository database space (both users in the same tablespace)
- Reserve at least 30GB file system space for installation on the server
Great document - Thank You!
ReplyDeleteCan you confirm (since you wrote separate checklists) if Hotfixes are cumulative for instance I can upgrade 9.5.0 to 9.5.1 HF2 without first installing 9.5.1 HF1?
Thanks for the comment. Yes you can directly install HF2 without HF1.
DeleteThank you! I appreciate the confirmation in addition to all of the great information you've already shared with us.
DeleteThis comment has been removed by the author.
ReplyDelete